| Vibration |
First resonance X 217 Hz, Y 230 Hz, Z 214 Hz |
| Thermal cycle |
0 ℃ / +30 ℃ |
| Hot antenna deployment |
+60 ℃, deployed 14 s or more after power-on |
| 30-minute deployment |
Deployed at 30 min 33 s, CW transmission at 30 min 50 s |
| Deployment force |
0.3 kgf, creep test load 1.96 kgf |
| Wire strength |
Creep, strength and proof tests passed |
| Inhibit |
Diode reverse current below 600 µA, DCDC output 4.20 V |
| 7-day battery measurement |
Voltage change 0.10 V, 2.38% |
| Deployment switch plunger |
Total spring force 1.70 N, requirement 1.08 to 5.3 N |