CIT-GARDENsChiba Institute of Technology CubeSat Program
BOTAN logo

GARDENs No.4 4th cohort

BOTANpeony

Botan-tan
STATUS
Mission ended
CALLSIGN
JS1YPT
VHF
145.825 MHz
UHF
437.375 MHz
LAST EVENT
Mission ended 2026.03.03

Operations

Operations

Operations of BOTAN

Operation period

Date Event
2025-02-28 Handover to JAXA
2025-09-16 Launch on Falcon 9 / Cygnus NG-23
2025-09-18 Arrival at the ISS
2025-10-10 Deployed from the ISS by astronaut Kimiya Yui
2026-02-27 Transmissions stopped
2026-03-03 Atmospheric re-entry, NORAD 65942

Initial operation plan

No. Activity Timing
1 Confirm CW communication From deployment until the first signal
2 Downlink HK data After the CW signal is confirmed
3 Downlink SAT LOG After the CW signal is confirmed
4 Downlink gyro data First week after the first signal
5 Camera mission capture and downlink First week after the first signal
6 APRS mission First week after the first signal

HK is acquired continuously for the first week after deployment; afterwards operation follows each mission

Results

Captured images are in Photos from orbit

BOTAN Aurora 2026-01-25

BOTAN CORN 2025-11-21

BOTAN PUMICE 2025-11-15

APRS campaign

An APRS campaign was held, and digital illustrations were presented to those who completed it